SPECIFICATION-LED SUPPLY
Nickel Alloys. Titanium. Bar, Plate, Tube, Pipe, Forgings. Build-to-Print Components. Supplied to Specification.
We read a specification the way the mill has to read it — standard and edition, delivery condition, melting route, inspection level — settled before anyone quotes a price.
THE FORM THE JOB NEEDS
The grade is one question and the form is another. Which form it arrives in decides the tolerance that applies, the product specification it is certified against and the lead time — all settled at RFQ rather than after. What we supply
BARMachined from solid — valve and pump internals, shafts, flanged bodies, fasteners.
PLATEVessels, towers, tubesheets and fabricated equipment — rolled, formed and welded.
TUBE & PIPEHeat-exchanger and condenser tubing, and process piping — seamless or welded.
FORGINGSForged bar, blocks, rings and discs, near-net shapes and rough-machined blanks.
WHAT AN ORDER CONSISTS OF
The grade, the paperwork,
and the duty it has to meet.
Three things decide whether a batch is acceptable —
and all three are settled before anyone prices anything.
Specialty Alloys
625, 718, C-276, Alloy 22, 2205, 2507, 904L, the 6Mo superaustenitic grades and titanium Gr.2, 5, 7, 12 and 23 — quoted against the product specification and edition you cite.
Bar · Plate · Tube & pipe · Forgings · Build-to-print componentsQuality & Documentation
Heat-to-part traceability, actual furnace records, PMI and NDT reported against a named acceptance class — the half of the order that decides whether the material is usable.
EN 10204 3.1 & 3.2 · PMI · NDT · MTRsIndustries
The same nine or ten grades cover most of these markets. What changes between them is the acceptance basis — which test, at which temperature, to which class.
Oil & gas · Refining · Power · Chemical · Pulp
To application.
ABOUT ARVON
We have been on the
other side of the audit.
An enquiry here starts with the specification stack rather than a price: governing standard and edition, delivery condition, melting route, inspection level and documentation grade.
Settle those and the quote is real. Leave them open and the number moves twice — once when the mill reads the drawing, and again when your inspector reads the certificate.
Learn about ARVONDocumentation
Heat-to-part traceability, actual heat-treatment records and NDT reported against a named acceptance class.
Supplier Qualification
We evaluate material suppliers and manufacturing partners based on documented capabilities, process controls and project-specific quality requirements.
Single Responsibility
Individual steps may be subcontracted. Traceability and final release authority are not.

BUILT AROUND THE APPLICATION
Industries We Serve
The same grades, judged against different acceptance criteria in each industry.
LET’S DEFINE YOUR NEXT REQUIREMENT
